Double D Mechanical Services · Preview build
Houston-based · Nationwide installs832-514-9736
Services · Double D Mechanical

Paint booth relocation for LNG energy modules

LNG energy module fabrication can involve large frames, pipe racks, enclosures, skids and packaged assemblies that require careful movement through prep and coating. Double D Mechanical relocates paint booths with attention to module clearances, airflow and exhaust, make-up air, utility routes, trade sequencing and long-term service access.

Discuss your installation

Clearance for module geometry

A booth move should start with the longest, tallest and widest assemblies expected in the finish area. The plan should account for projections, pipe ends, lifting points, carts, stands, crane coverage and room for applicators to reach all sides.

Airflow matched to the new booth position

Changing the booth location can alter duct runs, fan static pressure, intake air conditions and room pressure. Exhaust, make-up air, filters and discharge points should be reviewed as one system before reconnection.

Mechanical connections near module production

Gas, compressed air, power, controls and ductwork often need to cross busy assembly areas. Routes should avoid crane travel, welding zones, material staging and module paths while keeping valves, disconnects and panels accessible.

Coordinating reassembly with other trades

Relocation may require structural supports, roof work, electrical changes, controls work and fire protection coordination. Double D Mechanical sequences booth dismantling, movement and reconnection with the facility team and involved trades.

Walk notes for module shops

Prepare current booth photos, proposed layout drawings, module envelope dimensions, handling equipment limits, utility source locations, roof or wall details and any production milestones that affect access to the area.

Project questions

Frequently asked questions

Why is module geometry important for booth relocation?

Frames, pipe racks and skids may have projections that need more door, aisle and applicator clearance than their basic footprint suggests.

What changes when the exhaust route gets longer?

Longer or more complex duct runs can affect fan performance, supports, cleanout access, discharge location and the amount of replacement air needed.

Can utilities be routed overhead?

Overhead routing may work when structure, clearance, crane travel and service access allow it, but the exact path should be reviewed on site.

What should be photographed before the move?

Photograph booth panels, fan and duct connections, control panels, lights, gas or air connections, roof penetrations and any damaged components.

Who should attend the relocation walkthrough?

Plant engineering, finishing leadership, maintenance, safety, electrical, mechanical and any production planner responsible for module movement should be included.

Plan your installation

Bring us the equipment details.

Share the manufacturer, equipment size and plant location to discuss your project.

Request a quote832-514-9736