Double D Mechanical Services · Preview build
Houston-based · Nationwide installs832-514-9736
Industries · Double D Mechanical

Relocating Finishing Equipment for Michigan Oil and Gas Fabricators

Fabrication work follows contracts, and when a Michigan shop takes on oil and gas packages it may need to move finishing equipment to a larger bay, a second building or a new site entirely. A booth that worked fine in its old spot can underperform after a move if the reconnection is treated as an afterthought. Double D Mechanical relocates, reinstalls and services paint booths, ovens, exhaust and make-up air for fabrication shops around Detroit and throughout Michigan.

Discuss your installation

Taking Equipment Apart the Right Way

Label panels, doors and duct sections before removal. Record fan rotation, damper positions, burner settings and control wiring so the system can be rebuilt and set up the same way. Damaged gaskets, bent panels and worn fasteners are cheaper to replace before reassembly than after.

New Building, New Air Balance

The receiving building changes duct lengths, stack heights and roof conditions. That changes static pressure on the fans, so airflow targets have to be checked and the booth rebalanced against its make-up air once it is running again.

  • Duct length and fittings in the new route
  • Roof penetration and stack height
  • Make-up air intake location
  • Measured airflow compared to design

Utility Capacity at the New Site

Gas service, electrical capacity and compressed air may not match the old building. A heated booth or cure oven can add load the new site was not built for. Checking capacity before the move avoids equipment sitting idle while a service upgrade catches up.

Timing the Move Around Production

If fabrication must keep shipping, the move can be staged: set the new booth while the old one keeps running, then cut over. That requires space for both and a clear plan for the crane, rigging and trade schedule.

Working in Michigan

Planning a booth or oven project in Michigan

Crews mobilize from Houston; Michigan is roughly 1,100 miles away, so equipment, panels and tooling are staged and shipped ahead of the install crew.

Manufacturing in Michigan is concentrated around Detroit, Grand Rapids, Lansing, and Flint. The sectors most likely to be specifying spray booths, blast rooms, powder systems and cure ovens there include automotive assembly and suppliers, office furniture, tool and die, and EV batteries.

Cold winters mean make-up air heaters are sized for sub-freezing intake, and booth or oven placement has to account for frost lines, snow loads on roof penetrations and winter slab work.

Project questions

Frequently asked questions

How long does a booth relocation take?

It depends on equipment size, distance, the work needed at the new site and utility readiness. A site review of both locations is the way to build a realistic schedule.

Does an oven move the same way as a booth?

Ovens are similar but heavier and more sensitive to panel alignment and insulation damage. Burner and control reconnection also needs extra care at startup.

Can a relocated booth be made larger for oil and gas parts?

Some cabins can be extended or have doors changed, depending on the manufacturer's design and whether fans and heaters can handle the added volume.

What paperwork should travel with relocated equipment?

Original manuals, wiring diagrams, fan and burner data, startup readings and any maintenance records. These speed up reconnection and setup.

Is new ductwork always needed after a move?

Usually some is. The route in a different building rarely matches, though straight sections in good condition can sometimes be reused.

Plan your installation

Bring us the equipment details.

Share the manufacturer, equipment size and plant location to discuss your project.

Request a quote832-514-9736