Double D Mechanical Services · Preview build
Houston-based · Nationwide installs832-514-9736
Brands · Double D Mechanical

Wheelabrator Equipment for Offshore and LNG Modules

Offshore and LNG module frames bring heavy steel, tight internal spaces and strict finishing sequences into the same production area. Double D Mechanical supports Wheelabrator blast room installation, relocation and service by coordinating the room envelope, media reclaim, exhaust, make-up air and utility routes with the way module fabrications actually move through the plant.

Discuss your installation

Brand names identify the equipment discussed. Discuss your equipment model and installation scope with Double D; manufacturer authorization is not implied.

Module Frames And Handling Paths

Module assemblies may include skids, pipe racks, platforms and enclosure frames with protruding brackets or temporary lifting points. The blast room layout has to allow the largest expected assembly to enter, be positioned and leave without blocking cranes, forklifts or adjacent fabrication work.

Surface Prep Around Dense Steel

Cross members, base plates and welded joints create areas where abrasive and dust can collect. Planning the Wheelabrator room around operator access, lighting, reclaim trenches and cleanout locations helps crews work through complex frames without creating hard-to-maintain corners.

  • Review support stand height and floor loading before placement.
  • Keep access to recessed joints, underside members and skid edges in the layout discussion.
  • Coordinate reclaim equipment with the direction modules are loaded and unloaded.

Exhaust And Replacement Air Coordination

Large steel modules can divide the airstream and make exhaust performance dependent on part orientation. Mechanical review should include duct routes, fan locations, make-up air openings, heat requirements and how those systems fit with roof steel, fire protection, cranes and nearby process equipment.

Previsit Details For Energy Fabrication

A useful site review starts with a current floor plan, the largest module dimensions, coating process notes, utility locations, structural constraints and expected staging areas. Photos of existing equipment, overhead obstructions and wall or roof conditions can also shorten the planning conversation.

Project questions

Frequently asked questions

Why does module size matter so much for a blast room?

The module size sets the room envelope, door arrangement, handling path and operator clearance. Attachments, lifting points and temporary fixtures should be included in that measurement.

What utilities are typically reviewed for this type of project?

Power, compressed air, fuel gas if heat is part of the system, control wiring, lighting feeds and exhaust or make-up air routes are commonly reviewed during planning.

Can existing equipment be moved to a new production bay?

A relocation review looks at the room panels, reclaim components, fans, ductwork, utilities, floor conditions and whether the new bay supports module movement and maintenance access.

What should be checked around exhaust routing?

Roof or wall penetration points, fan service space, filter access, structural conflicts and the effect of nearby cranes or mezzanines should be reviewed before installation work begins.

Plan your installation

Bring us the equipment details.

Share the manufacturer, equipment size and plant location to discuss your project.

Request a quote832-514-9736