Trimac Industrial Systems for Switchgear Cabinets

Switchgear cabinet shells, doors, covers and removable panels need durable finishes before bus, controls and electrical hardware are installed. Trimac Industrial Systems cure ovens can support finishing lines where cabinet geometry, coating flow, heat, exhaust and service access all have to be planned together. Double D Mechanical installs, relocates and services the mechanical systems that connect booths, ovens and finishing support equipment.

Discuss your installation

Brand names identify the equipment discussed. Discuss your equipment model and installation scope with Double D; manufacturer authorization is not implied.

Tall Cabinets And Removable Panels

Switchgear cabinets can include tall frames, narrow doors, covers, louvers and hardware openings that change how parts are hung or staged. The layout should allow operators to reach inside returns and edges while preserving clearance for carts, racks and lift equipment.

Coating Sequence Before Wiring Work

The finishing route should keep fabricated shells moving from cleaning and masking into paint or powder, then through cure and cooling before electrical assembly. Keeping that route separate from cutting, drilling and grinding helps protect prepared surfaces and finished parts.

Oven Placement Near Production Flow

Trimac ovens need room for loading, unloading, heat expansion, exhaust runs, fan service and utility connections. Placement should account for make-up air discharge, gas and electrical routing, roof structure and the way cabinets move toward assembly after cure.

  • Document cabinet heights, rack sizes, panel carts and door swing.
  • Confirm load and unload direction around the oven.
  • Mark utility sources, roof access and nearby production constraints.

Service Zones That Stay Reachable

Filters, burners, fans, drives, light fixtures, control panels and duct cleanouts should not be boxed in by racks or WIP storage. For an equipment move, inspect section joints, control wiring, duct condition and the path for removing large assemblies.

Project questions

Frequently asked questions

What switchgear parts should be included in planning?

Include cabinet shells, doors, side panels, covers, louvers, racks and any fixtures used to support parts during coating and cure.

How does cabinet height affect installation?

Tall cabinets affect booth opening clearance, rack design, oven entrance height, conveyor clearance and access for operators coating upper surfaces.

Why coordinate make-up air with the oven and booth?

Balanced air helps the booth and oven operate without pulling conditioned air from nearby work areas or disrupting adjacent production ventilation.

Can Trimac oven equipment be relocated?

Relocation depends on equipment condition, section sizes, access for removal, duct layout, utility routes and the available space at the new location.

What documents help with a site review?

Layout drawings, part dimensions, utility information, roof details, photos and production flow notes are useful for planning the visit.

Plan your installation

Bring us the equipment details.

Share the manufacturer, equipment size and plant location to discuss your project.