Double D Mechanical Services · Preview build
Houston-based · Nationwide installs832-514-9736
Brands · Double D Mechanical

Trimac Industrial Systems for HVAC Units and Fans

HVAC cabinets, fan housings, panels, guards and sheet metal assemblies need finishing systems that fit high part variety and steady assembly demand. Trimac Industrial Systems cure ovens can be used with powder or liquid finishing operations where booth placement, oven access, exhaust, make-up air and utilities must be coordinated. Double D Mechanical installs, relocates and services the mechanical systems that support these production areas.

Discuss your installation

Brand names identify the equipment discussed. Discuss your equipment model and installation scope with Double D; manufacturer authorization is not implied.

Panels, Cabinets And Fan Housings

HVAC work can include flat panels, formed cabinet sections, round fan housings, guards and brackets in one finishing area. The layout should support both wide sheet metal parts and deeper housings without blocking coating access to seams, returns and corners.

Flow Into Final Assembly

Finishing equipment should be placed so parts move from fabrication or cleaning into coating, cure, cooling and assembly with limited backtracking. Staging should separate raw parts from finished components and keep carts from crowding booth doors or oven openings.

Ventilation And Cure Coordination

Trimac ovens and coating equipment need planned gas, electrical, exhaust, replacement air and control paths. Duct routing, fan access, roof structure and heat discharge should be reviewed with nearby sheet metal lines and assembly stations in mind.

  • Measure panels, housings, carts, racks and fixture heights.
  • Map fabrication, coating, cure, cooling and assembly paths.
  • Confirm utility sources, roof access and maintenance zones.

Relocation Around Active Production

If equipment is moved, the sequence should account for shutdown windows, section sizes, duct removal, control wiring, gas isolation and the new route for parts. Service clearance should remain open after the line is restarted and staged with normal work-in-process.

Project questions

Frequently asked questions

What HVAC parts affect booth and oven sizing?

Large panels, cabinet shells, fan housings, guards, brackets, racks and carts all affect clearance and loading space.

Why plan the finishing route with assembly?

A clear route reduces handling, protects finished panels and keeps coated parts moving toward final assembly without crossing raw fabrication traffic.

What utilities should be reviewed for Trimac equipment?

Gas, electrical service, controls, exhaust, replacement air and compressed air connections should be checked against the planned layout.

Can a finishing line be relocated while production continues nearby?

It requires careful sequencing around access, utility isolation, rigging, ductwork and temporary production constraints in adjacent areas.

What should be prepared for a site visit?

Part dimensions, rack details, photos, utility locations, roof information and notes on current bottlenecks are useful.

Plan your installation

Bring us the equipment details.

Share the manufacturer, equipment size and plant location to discuss your project.

Request a quote832-514-9736