Spray-Tech/Junair Paint Booth Installation

Spray-Tech/Junair paint booth installation starts with the booth style, the work moving through it, and the building systems that must support clean, repeatable finishing. Double D Mechanical handles booth setting, air and exhaust connections, utility coordination, and the mechanical details that affect airflow, service access, and daily production.

Discuss your installation

Brand names identify the equipment discussed. Discuss your equipment model and installation scope with Double D; manufacturer authorization is not implied.

Booth Layout Around Real Work

A downdraft, crossdraft, or refinish booth has to fit the parts, carts, lifts, doors, and operator movement around it. Layout planning should account for workpiece length, masking space, cure or flash areas, filter access, and the path finished parts take after coating. Small clearance problems can become daily slowdowns once production starts.

Airflow, Exhaust, and Make-Up Air

Paint booth performance depends on balanced intake and exhaust. Installation work may include exhaust fan placement, duct routing, roof or wall penetrations, intake plenums, and make-up air coordination. The goal is a booth that pulls overspray away from the operator while avoiding drafts that disturb the spray pattern.

Utilities and Trade Sequencing

Booth installation often intersects with electrical, gas, compressed air, sprinkler, controls, concrete, roofing, and building automation work. Double D Mechanical coordinates the mechanical scope so equipment setting, ductwork, air lines, and utility tie-ins are ready when adjacent trades need access.

  • Confirm booth footprint, door swing, and part travel before setting anchors.
  • Identify roof structure, wall openings, and crane or forklift access early.
  • Have equipment drawings, utility requirements, and control panel locations available before the site visit.

Start-Up Readiness

Before production use, the installation should be checked for filter fit, fan rotation, damper position, door sealing, light access, and maintenance clearances. Operators and maintenance staff benefit when filters, belts, motors, sensors, and panels can be reached without moving production equipment.

Project questions

Frequently asked questions

What should be ready before a Spray-Tech/Junair booth site visit?

Have the booth drawings, planned location, ceiling height, roof access information, utility locations, and the largest workpiece dimensions ready. Photos of the proposed path into the building also help.

Can an existing booth location be reused?

Sometimes, but the exhaust route, intake air, slab condition, utility capacity, and maintenance access still need to be checked against the booth being installed.

What building systems usually affect installation?

Electrical service, compressed air, gas or heat source, fire suppression, roof framing, exhaust discharge location, and make-up air all commonly affect the installation plan.

Why does make-up air matter for a paint booth?

The booth removes a large volume of air. Replacement air helps maintain stable booth pressure, spray quality, and operator comfort while reducing unwanted drafts from nearby doors or process areas.

How can production downtime be reduced during installation?

Downtime is reduced by confirming drawings, staging space, access paths, roof work, utility shutdowns, and trade sequencing before equipment arrives.

Plan your installation

Bring us the equipment details.

Share the manufacturer, equipment size and plant location to discuss your project.

Request a quote832-514-9736