Double D Mechanical Services · Preview build
Houston-based · Nationwide installs832-514-9736
Brands · Double D Mechanical

Spray-Tech/Junair Bus Booth Work

Bus finishing requires space for long bodies, rooflines, side panels, mirrors, doors and access platforms while protecting coating quality. Double D Mechanical installs, relocates and services paint booths, prep stations, make-up air, exhaust ductwork, lighting, heating and utility connections used around Spray-Tech/Junair equipment.

Discuss your installation

Brand names identify the equipment discussed. Discuss your equipment model and installation scope with Double D; manufacturer authorization is not implied.

Bus Height And Platform Access

Bus bodies need room for roof work, side panel access and safe movement around the full vehicle. Booth placement should account for platforms, ladders, open doors, mirrors, destination signs and any fixtures used during paint.

  • Measure the full vehicle envelope with mirrors and doors considered.
  • Confirm roof access needs before finalizing light and duct locations.
  • Keep service panels and exits clear of platforms and staging carts.

Prep, Masking And Booth Loading

Fleet and production bus work can involve sanding, masking, cleaning and spot repairs before full coating. Prep space, mixing room access and booth loading direction should support a clean handoff into paint without pulling dust into the booth.

Ventilation For Large Side Panels

Large flat panels make airflow consistency important. Exhaust condition, make-up air placement, heater operation, filter loading and door fit all affect how the booth performs across the length of the bus.

Relocation Details To Capture

Before a booth move, document ductwork, fan supports, electrical feeds, gas or fuel connections, control wiring, light locations, fire protection interfaces and available clearances in the new bay.

Project questions

Frequently asked questions

What is important when planning a bus paint booth location?

Review vehicle length, height, mirror width, door swing, platform access, booth entry path, roof clearance, exhaust routing and make-up air location.

Can prep stations be part of the same project?

Yes. Prep stations, mixing rooms, booth entries and exhaust systems should be coordinated so sanding and masking do not interfere with clean paint work.

What can cause airflow issues in a bus booth?

Loaded filters, poor replacement air, door leakage, blocked exhaust paths, fan issues and nearby building pressure changes can all affect airflow.

What does Double D Mechanical need for troubleshooting?

Photos, equipment information, the symptoms, filter condition, fan access, control panel details and notes about when the problem occurs are all helpful.

Plan your installation

Bring us the equipment details.

Share the manufacturer, equipment size and plant location to discuss your project.

Request a quote832-514-9736