Spray Systems large equipment paint booth installation
Spray Systems large equipment paint booths are used for oversized fabricated products, machinery, modules and long assemblies that need controlled finishing space. Double D Mechanical plans installation, relocation and connections around part movement, airflow volume, exhaust routing, make-up air, utilities and service access.
Discuss your installationBrand names identify the equipment discussed. Discuss your equipment model and installation scope with Double D; manufacturer authorization is not implied.
Sizing the Work Envelope
Large booth planning starts with the part envelope, not just the booth panels. Height, length, door opening, crane coverage, forklift approach, rack clearance and operator reach all shape the final layout. The booth should leave enough room for safe movement around the workpiece.
High-Volume Air and Duct Coordination
Oversized booths can require substantial exhaust and replacement air coordination. Fan sections, duct runs, stack locations, roof openings and make-up air equipment need to be planned with building steel, overhead doors, cranes and neighboring exhaust systems.
Utilities Across a Larger Footprint
Lighting, controls, compressed air, electrical service and fire protection interfaces may be spread across a long enclosure. Utility routing should be accessible for maintenance while staying clear of door travel, operator platforms and material handling paths.
Move Planning for Oversized Booths
Relocating a large booth requires careful documentation of panel order, fan orientation, duct connections, door assemblies, controls and utility entry points. The receiving area should be checked for rigging access, floor space, overhead obstructions and service clearances before work begins.
- Confirm the largest part dimensions, handling method and staging needs.
- Review roof, wall and structural conditions near proposed duct routes.
- Identify shutdown windows and trade sequencing before disconnect work.
Frequently asked questions
What should be measured before a large booth installation?
Measure the largest parts, handling equipment, door paths, crane coverage, ceiling height and available service space.
Why does exhaust routing need early review?
Large duct and fan components can conflict with roof structure, cranes, utilities, doors and other process equipment.
Can a large equipment booth be relocated?
Yes, when the enclosure, air handling equipment, ductwork, utilities and rigging path can be planned for the new location.
What helps prepare for a site visit?
Equipment drawings, photos, part dimensions, building plans, utility locations and notes on production constraints are helpful.