Switchgear cabinet shells, doors and removable panels are typically finished before electrical assembly. Spray Systems equipment used for this work can include open-face paint booths and large-equipment booths that require practical coordination with airflow, exhaust, lighting, utilities and material handling. Double D Mechanical installs, relocates and services the booth and mechanical connections that support cabinet finishing areas.

Discuss your installation

Brand names identify the equipment discussed. Discuss your equipment model and installation scope with Double D; manufacturer authorization is not implied.

Cabinet Shell Clearance

Switchgear cabinets can be tall, deep and awkward to coat around flanges, openings and interior returns. The booth opening, staging space and handling path should be checked with the full cabinet envelope and cart or lift method included. Door swing, removable panels and inspection access should also be considered before the booth position is finalized.

Masking And Clean Staging

Cabinets may need masked openings, gasket areas or mounting surfaces before coating. A workable layout gives masking and cleaning enough space without pulling dust into the booth. Finished cabinets should move toward assembly without crossing grinding, welding or raw panel traffic.

Exhaust And Lighting Coordination

Open-face booths depend on consistent air movement and good visibility across cabinet surfaces. Fan placement, duct routing, roof access, lighting, compressed air and electrical service should be coordinated before installation. Make-up air planning is important when other process exhaust or large doors affect the same building zone.

  • Confirm the largest cabinet shell dimensions with cart, rack or lift clearance included.
  • List masking, cleaning, coating, flash or dry time and inspection steps in order.
  • Prepare utility locations, roof access details and nearby equipment constraints for review.

Booth Condition Before A Move

Relocating an existing Spray Systems booth should include a check of panels, filter frames, lights, fan sections, ducts, controls and connection points. The destination should preserve access for filter changes, lighting service and duct inspection. Early planning helps the booth fit the new cabinet line without creating hard-to-reach service points.

Project questions

Frequently asked questions

What drives booth sizing for switchgear cabinets?

The largest cabinet shell with its handling method usually drives the booth opening, staging area and aisle clearance.

Why is lighting part of the planning discussion?

Cabinet faces, edges and interior returns need visibility for coating and inspection, especially on large flat surfaces.

What utilities are commonly reviewed?

Electrical service, compressed air, exhaust routing, replacement air and control locations are commonly reviewed.

What should be checked before moving a booth?

Panels, filter frames, lights, fan sections, ductwork, controls, utility disconnects and the route for removing and resetting components should be checked.