Double D Mechanical Services · Preview build
Houston-based · Nationwide installs832-514-9736
Brands · Double D Mechanical

Spray Systems Booths for HVAC Units and Fans

HVAC unit and fan finishing cells often handle sheet metal panels, cabinets, housings, frames and repeat components that move quickly between fabrication, coating and assembly. Double D Mechanical installs, relocates and services Spray Systems open-face booths, powder booths, paint booths, cure ovens, exhaust ductwork, heaters, lighting and air make-up connections for HVAC manufacturing environments.

Discuss your installation

Brand names identify the equipment discussed. Discuss your equipment model and installation scope with Double D; manufacturer authorization is not implied.

Cabinet Panels And Fan Housings

Panels, housings and frames may vary from flat sheet metal to bulky assemblies with corners and internal surfaces. Booth openings, rack spacing, hanging methods and spray access should match the product mix and avoid unnecessary rework after assembly.

Line Movement To Cure

Powder coating and liquid finishing both depend on smooth movement from prep to booth to oven or drying space. Conveyor paths, carts, cooling zones and inspection areas should be coordinated so finished parts do not cross back through fabrication traffic.

Open-Face And Powder Booth Layout

Open-face booths need clear capture zones, while powder booths need containment and reclaim access where applicable. Part depth, operator position, rack width and booth face loading should be reviewed before equipment is placed.

Oven Heat And Exhaust Coordination

Cure ovens, booth exhaust and make-up air can place meaningful loads on utilities and building balance. Heater access, duct routing, fan location and discharge points should be coordinated with roof structure and production aisles.

Service Access In Repeat Production

HVAC lines can run with dense racks and tight aisles. Filters, lights, fan components, oven doors, burners, dampers and controls should remain reachable without dismantling normal part flow.

Project questions

Frequently asked questions

What HVAC parts should be considered when sizing booth equipment?

Use the largest cabinets, deepest fan housings, widest racks, tallest hanging height and any parts that require unusual spray angles.

Can powder booths and cure ovens be installed with paint booths nearby?

Yes, when airflow, oven heat, part routing, cleaning needs and service access are planned for each process.

Why does make-up air matter in an HVAC manufacturing plant?

Booth exhaust and oven exhaust can affect building pressure. Make-up air helps stabilize airflow around coating areas and nearby production spaces.

What should be reviewed for a booth relocation?

Review booth condition, panel layout, ductwork, controls, utility tie-ins, new clearances, part flow and access for setting equipment.

What information helps before a site visit?

Part dimensions, rack details, process flow, utility locations, ceiling heights, proposed equipment area photos and expected oven or booth connections are useful.

Plan your installation

Bring us the equipment details.

Share the manufacturer, equipment size and plant location to discuss your project.

Request a quote832-514-9736