Double D Mechanical Services · Preview build
Houston-based · Nationwide installs832-514-9736
Brands · Double D Mechanical

RTT Finishing Solutions Fabricated Parts Booth Work

Fabricated metal parts finishing can include brackets, frames, panels, covers, housings and welded assemblies moving through blast, wash, mask, paint, powder or cure steps. Double D Mechanical installs, relocates and services booths, blast rooms, ovens, make-up air, exhaust ductwork, lighting and utility connections used around RTT Finishing Solutions equipment.

Discuss your installation

Brand names identify the equipment discussed. Discuss your equipment model and installation scope with Double D; manufacturer authorization is not implied.

Part Variety And Loading Method

Fabrication shops often run a changing mix of small parts, awkward weldments and larger assemblies. Equipment placement should reflect how parts arrive at finishing, whether they move by cart, rack, conveyor, forklift or crane, and how much staging is needed before coating.

  • Identify the largest part envelope and the most common production mix.
  • Review rack, hook, cart and conveyor clearance before booth placement.
  • Separate blast dust and grinding debris from clean coating zones.

Prep Room To Coating Sequence

Blast rooms, abrasive booths, powder booths and liquid paint booths should be laid out so parts move forward without crossing back through dirty work. Masking tables, inspection points and rework areas need enough room to support production without blocking booth doors or exhaust service.

Exhaust, Heat And Utility Tie-Ins

Fabricated metal finishing equipment may need exhaust fans, duct penetrations, make-up air, gas or fuel connections, compressed air, electrical feeds and control wiring. Early coordination helps avoid conflicts with cranes, sprinkler mains, bus duct, mezzanines and existing process utilities.

Service Planning For Mixed Work

A high-mix finishing area should remain serviceable when production is busy. Filter banks, fan bearings, dampers, lighting, powder recovery components, oven panels and disconnects should be reachable without emptying the entire finishing department.

Project questions

Frequently asked questions

What should we have ready before a fabricated parts site visit?

Have floor plans, equipment drawings, part dimensions, rack details, utility locations, roof information, current airflow concerns and photos of the proposed installation area.

Can blast and paint equipment be moved together?

They can be planned together when the new layout accounts for dust control, material handling, exhaust routing, media recovery and clean coating separation.

What utilities are commonly reviewed for RTT finishing equipment?

Common items include electrical feeds, compressed air, gas or fuel for heaters, lighting circuits, controls, make-up air, exhaust ductwork and fire protection interfaces.

How does part mix affect booth sizing?

The largest parts set the minimum opening and clearance, while the daily mix affects rack spacing, operator access, airflow needs and how much staging space should be protected.

Plan your installation

Bring us the equipment details.

Share the manufacturer, equipment size and plant location to discuss your project.

Request a quote832-514-9736