Double D Mechanical Services · Preview build
Houston-based · Nationwide installs832-514-9736
Brands · Double D Mechanical

Rohner for Trailers

Trailer frames, bodies and assemblies need finishing layouts that handle long workpieces, exposed rails, underside edges and large side panels. Rohner crossdraft, truck and large equipment paint booths may be connected with blast rooms, media reclaim equipment, make-up air and exhaust systems. Double D Mechanical installs, relocates and services the mechanical connections that support trailer coating operations.

Discuss your installation

Brand names identify the equipment discussed. Discuss your equipment model and installation scope with Double D; manufacturer authorization is not implied.

Long Frame Movement

Trailer work needs careful attention to bay length, door approach, turning space and staging at both ends of the booth. Frames and bodies may require carts, dollies, forklifts or cranes, and those handling methods should be reviewed before booth placement is finalized.

Surface Prep And Coating Order

A practical trailer finish area keeps blast, sanding, cleaning, masking, coating and inspection in a workable order. Blast room doors, reclaim equipment and dirty staging should not force cleaned trailers to cross dusty areas. Masking and touch-up space should be close enough to support production without blocking booth access.

Ventilation For Extended Workpieces

Long frames and tall side panels can interrupt airflow if they sit too close to intake or exhaust points. Exhaust ductwork, make-up air, heat and lighting should be coordinated so the booth supports end-to-end coverage and comfortable operator movement.

  • Measure the longest trailer, frame, support fixture and entry route.
  • Identify blast, clean, mask, coat, dry and inspection areas.
  • Confirm utility routes, roof access, ceiling height and obstructions.

Service Access Along The Bay

Filters, fans, heaters, light fixtures, doors, dampers and control panels need room for service after trailers are staged in normal positions. Relocated equipment should be reviewed for condition, section size, duct compatibility and access to the new utility tie-ins.

Project questions

Frequently asked questions

What makes trailer booth planning different?

Trailer length, support fixtures, underside access, entry approach and staging at both ends place extra demands on the bay layout.

How should blast equipment fit into trailer finishing?

Blast areas should contain dust and allow cleaned trailers or frames to move to coating without crossing dirty staging zones.

What utility items are usually checked?

Gas, electrical power, compressed air, controls, lighting, exhaust ductwork, make-up air and roof or wall openings are commonly checked.

Can Rohner trailer booth equipment be relocated?

Relocation depends on booth condition, fan and heater condition, removal paths, available utilities, duct routes and the new bay dimensions.

What helps before a site walk?

Trailer dimensions, handling methods, layout drawings, utility locations, roof access and photos of current equipment are helpful.

Plan your installation

Bring us the equipment details.

Share the manufacturer, equipment size and plant location to discuss your project.

Request a quote832-514-9736