Double D Mechanical Services · Preview build
Houston-based · Nationwide installs832-514-9736
Brands · Double D Mechanical

Rohner for Rail Cars

Rail car bodies and assemblies require large finishing spaces for long sides, roof sections, underframe areas and door openings. Rohner crossdraft, rail car and large equipment paint booths may be connected with blast rooms, media reclaim, make-up air and exhaust systems. Double D Mechanical installs, relocates and services the booth, air, exhaust, lighting and utility connections around rail coating areas.

Discuss your installation

Brand names identify the equipment discussed. Discuss your equipment model and installation scope with Double D; manufacturer authorization is not implied.

Track Alignment And Clearance

Rail car booth planning starts with the car length, track centerline, door opening, roof clearance and side access. Platforms, lifts, carts and masking stations should fit around the car without blocking filters, controls or safe movement through the bay.

Containment Before Coating

Abrasive preparation, cleaning and masking should be arranged so dust is contained before cars enter the paint area. Blast room doors, media reclaim equipment and staging zones need enough room for rail movement and service access. Clean transfer into coating helps protect prepared surfaces.

Air Systems For Long Cars

Rail car work can require large exhaust volumes and careful make-up air placement. Duct routes, replacement air, heat, lighting and controls should be coordinated with tracks, platforms and roof structure so the booth can be serviced after startup.

  • Measure car length, height, width, track layout and platform needs.
  • Identify blast, clean, mask, coat, dry and inspection positions.
  • Confirm utility routes, roof access and overhead obstructions.

Maintenance Paths Around Rails

Filters, fans, lights, heaters, doors and dampers need access even when rail equipment is in place. Relocation planning should include booth section sizes, panel condition, fan and heater condition, rigging paths and utility tie-in locations in the new bay.

Project questions

Frequently asked questions

What rail details affect booth layout?

Track centerline, car length, car height, platform needs, door openings and side access all affect booth placement.

How should blast work connect to coating?

Blast and cleaning should contain dust while allowing prepared rail cars to move into coating with limited handling and clean staging.

Why coordinate ductwork with platforms?

Platforms and overhead structure can limit routes for ductwork, lighting, make-up air and service access around the booth.

Can Rohner rail car booth equipment be relocated?

Relocation depends on section sizes, equipment condition, rigging access, track layout, utilities and new duct or roof openings.

What information helps before a site walk?

Track layout, car dimensions, platform details, utility locations, roof access and photos of existing equipment are helpful.

Plan your installation

Bring us the equipment details.

Share the manufacturer, equipment size and plant location to discuss your project.

Request a quote832-514-9736