Double D Mechanical Services · Preview build
Houston-based · Nationwide installs832-514-9736
Brands · Double D Mechanical

Parker Ionics Paint Booth Relocation

Moving a Parker Ionics booth means preserving the equipment arrangement while adapting it to a new footprint, new part flow and new utility routes. Double D Mechanical plans the dismantling, handling, exhaust changes, compressed air, electrical service, make-up air and restart access around the plant's production needs.

Discuss your installation

Brand names identify the equipment discussed. Discuss your equipment model and installation scope with Double D; manufacturer authorization is not implied.

Survey Before Dismantling

A relocation should start with photos, measurements and notes on how the booth, filters, recovery equipment, exhaust, controls and utilities are connected. This reduces guesswork when components are staged and reassembled.

  • Mark panels and connection points before removal.
  • Measure service clearances and booth openings.
  • Record duct, air and electrical interfaces.

Handling Path to the New Area

The move path must account for component size, lift access, aisle width, door openings, overhead obstructions and temporary staging. Active production zones may need separation or sequencing.

Fit, Air and Utility Rework

The new location may require revised exhaust ductwork, fan supports, compressed air drops, electrical feeds, controls and make-up air placement. These changes should be coordinated before the booth is anchored.

Readiness Before Coating Resumes

Before the booth returns to production, confirm panels, seals, filters, access doors, fan rotation, utility labels, housekeeping clearance and the part path through the new area.

Project questions

Frequently asked questions

What should be documented before moving a Parker Ionics booth?

Document panel layout, filter and recovery equipment, exhaust connections, utilities, controls, clearances and any damaged components.

Does a relocation usually change ductwork?

Often it does. New booth placement can change duct length, supports, fan location, discharge route and make-up air needs.

How is the new footprint checked?

The layout is checked against part size, rack or cart travel, service access, utility routing, ceiling height and nearby production areas.

What helps plan the relocation visit?

Equipment drawings, photos, floor plans, measurements, utility notes, ceiling details and shutdown constraints are all useful.

Plan your installation

Bring us the equipment details.

Share the manufacturer, equipment size and plant location to discuss your project.

Request a quote832-514-9736