Double D Mechanical Services · Preview build
Houston-based · Nationwide installs832-514-9736
Brands · Double D Mechanical

Nova Verta Aircraft And Component Booth Work

Aircraft component coating asks a booth system to handle clean prep, controlled spray access, balanced air and reliable utilities. Double D Mechanical installs, relocates and services Nova Verta booth equipment, exhaust ductwork, make-up air, lighting, heaters and related connections for component-focused finishing areas.

Discuss your installation

Brand names identify the equipment discussed. Discuss your equipment model and installation scope with Double D; manufacturer authorization is not implied.

Component Geometry And Work Stands

Panels, fairings, doors and aircraft support parts often sit on stands or carts that change their effective height and footprint. Booth planning should include fixture dimensions, technician reach, part rotation, masking areas and the route from prep to coating.

Clean Prep Before Spraying

Sanding and masking areas need enough separation to keep dust from entering the spray zone, while remaining close enough for careful handling of finished surfaces. Prep station placement should also leave room for inspection, tack-off, material carts and covered staging.

Downdraft Air And Exhaust Routing

Downdraft booth performance depends on steady replacement air, unobstructed exhaust and practical duct runs. Roof openings, air units, gas, electrical service and control wiring should be coordinated with surrounding building systems before equipment is set.

What To Review On Site

A productive visit starts with booth drawings, existing equipment photos, fan and heater nameplates, control panel information, utility capacities and notes on nearby obstructions. For relocation, include measurements of doors, aisles, ceiling steel and any equipment that cannot move.

Project questions

Frequently asked questions

What makes aircraft component finishing different from general parts work?

Parts may be lightweight, curved, masked in detail and handled on dedicated stands. The booth layout needs to protect clean surfaces and give technicians access to all spray angles.

How should make-up air be considered?

Replacement air should be planned with exhaust so the booth does not pull uncontrolled air from doors, hangar openings or adjacent prep areas.

Can a Nova Verta booth be serviced in place?

Many service tasks can be done in place if filters, lights, fans, burners, controls and duct access are reachable. Crowded walls or stored fixtures can make access harder.

What should be checked before moving existing equipment?

Check panel condition, fasteners, doors, controls, wiring, ductwork, fan condition, utility disconnects and whether the new location supports the same airflow path.

Plan your installation

Bring us the equipment details.

Share the manufacturer, equipment size and plant location to discuss your project.

Request a quote832-514-9736