Marathon for Heavy Equipment

Heavy equipment finishing can involve frames, buckets, arms, cabs, counterweights, weldments and complete machines. Marathon crossdraft and large equipment booth layouts may connect with blast rooms, abrasive prep, paint mixing rooms, make-up air and exhaust systems. Double D Mechanical installs, relocates and services the booth, air, exhaust, lighting and utility connections that support heavy equipment coating work.

Discuss your installation

Brand names identify the equipment discussed. Discuss your equipment model and installation scope with Double D; manufacturer authorization is not implied.

Machine Envelope And Handling Path

The largest machine or weldment should be measured with attachments, stands, lifting points and turning requirements included. Booth doors, aisle widths, ceiling height and staging should match how the equipment actually moves. Forklifts, cranes, tow vehicles and carts need room to operate without blocking service areas.

Abrasive Prep And Paint Sequence

Heavy equipment often needs blast or aggressive prep before coating. Blast rooms, reclaim equipment, masking areas and paint booths should be arranged so cleaned parts do not cross dirty traffic. Double D Mechanical can coordinate booth placement, ductwork, fan locations, heater connections and utility drops around the production sequence.

Air, Heat And Roof Routing

Large booths can place high demand on exhaust and replacement air. Heat, duct routing, roof penetrations, electrical feeds and control wiring should be reviewed before equipment locations are finalized so the booth works with the building rather than fighting it.

  • Measure the largest machine, attachment and fixture combination.
  • Identify lifting, towing or cart movement through prep and paint.
  • Confirm gas, electrical, compressed air, roof access and crane clearances.

Service Access In Rugged Bays

Heavy equipment areas can be crowded with tools, hoses, weld fixtures and mobile platforms. Filters, fans, lights, heaters, doors, ducts and controls need accessible space after production starts. For relocation, equipment condition and the new route for utilities should be reviewed before the booth is moved.

Project questions

Frequently asked questions

What should be measured for heavy equipment booth planning?

Overall length, width, height, attachment position, fixture size, handling method and turning space should be measured in the loaded condition.

Why coordinate blast and paint equipment together?

The sequence affects clean movement, dust control, staging, utility routing and how operators access the workpiece between preparation and coating.

What utilities are commonly needed around a large booth?

Electrical service, compressed air, gas, control wiring, exhaust routing, make-up air, lighting and roof access are common planning items.

Can Marathon heavy equipment booths be relocated?

Relocation depends on booth condition, removal clearance, new bay size, utility reach, duct routing, fan condition and maintenance access.

How can maintenance access be protected?

Keep filters, lights, fan sections, heaters, ducts, doors and control panels clear of storage, lifts, carts and work platforms.