IST (Kresco) Structural Steel Blast Room Installation

Structural steel finishing brings beams, columns, trusses, plates and welded assemblies into abrasive preparation areas before project coatings. Double D Mechanical installs, relocates and services blast rooms, media reclaim systems, booth exhaust, make-up air and utility connections used around IST (Kresco) equipment for steel fabrication shops.

Discuss your installation

Brand names identify the equipment discussed. Discuss your equipment model and installation scope with Double D; manufacturer authorization is not implied.

Beam And Column Flow

Long steel members need straight loading paths, stable supports and room to stage pieces before and after blasting. Layout planning should account for maximum beam length, crane travel, transfer carts, sawhorse height and the route into coating or laydown areas.

Preparation Around Welded Details

Connections, stiffeners, clips and copes can require focused blasting around tight edges. The room should allow operators to reach both sides of fabricated members while keeping hoses, lighting and recovery floors out of the handling path.

Reclaim And Dust Collector Placement

Structural steel work can produce heavy media movement over long floor areas. Reclaim equipment, separator location and collector access should be arranged so cleanup, media return and filter service do not interfere with loading steel.

Exhaust Path And Utility Checks

Before installation or relocation, confirm electrical service, compressed air supply, wall or roof exhaust routes, make-up air location, control panel access and any overhead crane conflicts. These items shape both equipment placement and trade sequencing.

Project questions

Frequently asked questions

What steel dimensions are needed for planning?

Maximum length, width, height, member weight, support method and crane or forklift path are the starting points for blast room layout.

How does structural steel affect reclaim design?

Long members spread abrasive across a larger floor area, so recovery layout should match the blast zone and leave space for handling equipment.

Why separate blasting from coating traffic?

Blasted steel should move toward coating without crossing dusty cleanup areas, stored media or dirty forklift routes.

What utilities are most important?

Compressed air, electrical service, controls, lighting, exhaust routing and make-up air are central to installation planning.

Can existing blast rooms be modified for larger steel?

Some modifications may be possible, but door openings, room length, reclaim layout, collector capacity, utilities and structural clearances must be reviewed first.