Storage tanks and pressure vessels need surface preparation spaces that can handle cylindrical shells, heads, nozzles, saddles and welded attachments before protective coating. IST (Kresco) equipment in this application centers on blast rooms, abrasive blast booths and media reclaim systems planned around large part movement and heavy dust load.

Discuss your installation

Brand names identify the equipment discussed. Discuss your equipment model and installation scope with Double D; manufacturer authorization is not implied.

Round Shell Handling

Tank and vessel work often brings long cylinders, domed heads and irregular nozzle geometry into the same preparation area. The room layout has to account for stands, rotators, cranes, forklifts and the clearance needed for operators to reach weld seams and end closures.

Reclaim Paths Under Heavy Parts

Media recovery needs to survive traffic from carts, rotators and support stands. Reclaim trench location, grate strength, cleanout access and separator placement should be reviewed against the actual handling plan rather than only the room footprint.

Collector Routing And Air Balance

Abrasive preparation of tanks and vessels can generate sustained dust loads. Exhaust duct, dust collector location, discharge path and replacement air should be coordinated with adjacent coating areas so blast room pressure remains stable and dust does not migrate through shared production space.

Connections And Service Clearance

Installation planning should reserve space for compressed air drops, electrical panels, controls, blast pot access, media storage, reclaim service points and dust collector maintenance. Clearances around doors and hoppers matter because tank work tends to use large fixtures that can block access if they are not planned early.

What To Have Ready

Bring vessel diameter ranges, maximum lengths, support method, target surface preparation process, expected media type, building drawings, slab notes and photos of the proposed equipment path. Existing collector, compressor and utility information can shorten the site review.

Project questions

Frequently asked questions

How is tank size used in blast room planning?

Diameter, length and support method determine door size, room length, side clearance and where operators can work safely around the shell.

What makes media reclaim different for vessels?

The reclaim layout must work around heavy supports and round parts that may be rotated or shifted during preparation. Cleanout points and grate areas should remain reachable after fixtures are in place.

Can blast equipment and coating equipment share nearby air systems?

They should be evaluated together, but each process needs proper exhaust and replacement air. Shared building pressure problems can affect dust control, coating quality and door operation.

What should be checked before connecting utilities?

Compressed air capacity, electrical requirements, control locations, duct routes, collector access and service clearances should be confirmed before final setting and tie-in work.

Plan your installation

Bring us the equipment details.

Share the manufacturer, equipment size and plant location to discuss your project.

Request a quote832-514-9736