Double D Mechanical Services · Preview build
Houston-based · Nationwide installs832-514-9736
Brands · Double D Mechanical

Intek Powder Coating System Installation

Intek infrared cure equipment may be used in powder coating systems for enclosures, HVAC components, fabricated metal and similar production work. Installation planning should connect the application booth, cure section, part handling, electrical service, controls, airflow and maintenance access.

Discuss your installation

Brand names identify the equipment discussed. Discuss your equipment model and installation scope with Double D; manufacturer authorization is not implied.

Cure Zone in the Production Flow

Double D Mechanical reviews how parts move from powder application into the infrared cure area and then to cooling or inspection. The cure zone needs clear part spacing, consistent handling and room for operators to work safely.

  • Confirm part size, material mix and fixture dimensions.
  • Review conveyor, cart or rack movement through the cure area.
  • Keep clearance around emitters, panels, controls and guards.

Booth Connection and Transfer Space

The distance between the powder booth and cure equipment affects contamination control, operator movement and throughput. Transfer areas should be planned so parts do not crowd the booth opening or block access to filters and recovery equipment.

Electrical Load and Control Placement

Infrared cure systems place particular focus on electrical feeds, control cabinets, disconnects, sensors and cable routing. These items should land where they remain accessible without interfering with moving parts or maintenance tasks.

Airflow Around Heat and Powder

Powder booth exhaust, room replacement air and heat movement around the cure section should be reviewed together. Drafts, open doors and nearby exhaust can influence powder containment and curing consistency.

Project questions

Frequently asked questions

What is different about installing Intek infrared cure equipment?

Planning focuses on part spacing, emitter clearance, electrical capacity, controls, guarding, airflow and how parts transfer from coating into cure.

Does a powder booth still need make-up air planning?

Yes. Booth exhaust needs replacement air so the finishing area can maintain stable airflow and avoid drafts around the cure section.

What utilities should be identified before the visit?

Identify electrical service, disconnect locations, control panel space, compressed air if used, exhaust connections and nearby building systems.

What should be measured in advance?

Measure part dimensions, fixture size, conveyor or cart height, ceiling clearance, aisle space and the distance between coating, cure and cooling areas.

Plan your installation

Bring us the equipment details.

Share the manufacturer, equipment size and plant location to discuss your project.

Request a quote832-514-9736