Intek for Metal Fabrication

Metal fabrication finishing can send formed parts, weldments, brackets, frames and panels through coating and cure with frequent changes in size and handling method. Intek infrared oven installation or relocation should account for surface exposure, part movement, exhaust, electrical service, controls and service clearance.

Discuss your installation

Brand names identify the equipment discussed. Discuss your equipment model and installation scope with Double D; manufacturer authorization is not implied.

Part Faces And Shadow Areas

Infrared curing should be planned around how fabricated parts present surfaces to the heat source. Deep flanges, frames, weldments and dense racks may create shadowed areas that affect spacing and line layout.

Movement From Coat To Cure

Manual carts, racks and conveyors need a clean path between coating and cure. The oven position should leave room for loading, hot part exit, inspection and any rework station without crossing active fabrication traffic.

Electrical Capacity And Access

Electrical feeders, disconnects, controls and cable routes should be identified early. Access to control panels and service points should remain clear after guards, conveyors, racks and nearby equipment are installed.

Shop Conditions To Review

Before a walkthrough, gather part sizes, rack spacing, coating method, intended throughput, ceiling height, floor condition, utility locations, exhaust options and photos of the surrounding shop.

Project questions

Frequently asked questions

What makes infrared oven planning different in fabrication shops?

Part geometry changes often, so heater exposure, spacing and handling paths need review for both common work and the largest unusual parts.

Can infrared cure equipment fit near existing conveyors?

It can be evaluated with conveyor height, carrier spacing, guarding, electrical access, service clearance and the path for exhaust or ventilation.

What information helps with electrical planning?

Panel locations, available service, disconnect preferences, control locations and overhead or wall routing constraints all help during planning.

What should be checked before moving existing equipment?

Check rigging clearance, utility disconnect points, equipment section sizes, the new floor area, exhaust changes and maintenance access at the new position.

Plan your installation

Bring us the equipment details.

Share the manufacturer, equipment size and plant location to discuss your project.