Double D Mechanical Services · Preview build
Houston-based · Nationwide installs832-514-9736
Brands · Double D Mechanical

Intek for HVAC Equipment Manufacturing

HVAC equipment manufacturing can involve cabinets, panels, louvers, frames, housings and sheet metal assemblies that move through coating and cure in varied sizes. Intek infrared oven work should be planned around part orientation, conveyor or cart flow, heat exposure, exhaust, electrical service and access for maintenance.

Discuss your installation

Brand names identify the equipment discussed. Discuss your equipment model and installation scope with Double D; manufacturer authorization is not implied.

Sheet Metal Orientation

Panels, frames and cabinets can present broad faces, edges and recesses to the cure zone. Layout planning should account for carrier spacing, shadowed surfaces, part height and the clearance needed for loaded racks.

Airflow Near Assembly Areas

The cure area should be coordinated with booth exhaust, building ventilation and make-up air. HVAC plants often have many air-handling activities nearby, so pressure and drafts should be considered early.

Power And Controls Routing

Infrared equipment depends on electrical service and controls that need practical access. Conduit, panels and control wiring should be routed around conveyors, carts, assembly stations and maintenance lanes.

Details To Bring Forward

Useful inputs include part families, rack dimensions, line speed targets, coating sequence, electrical information, ceiling height, exhaust route options, floor condition and photos of the intended equipment area.

Project questions

Frequently asked questions

What HVAC parts should be considered when planning an Intek oven?

Include the largest cabinets, panels, louvers, frames and formed assemblies, plus any rack or carrier dimensions that change the actual part envelope.

Why does part orientation matter for infrared curing?

Infrared heat reaches surfaces differently depending on angle, spacing and shadowing, so the way parts face the heaters is part of the layout review.

How should exhaust be considered in an HVAC plant?

Exhaust should be reviewed with building make-up air and nearby process ventilation so the coating area and cure area remain stable.

What can limit a relocation route?

Door openings, ceiling height, overhead utilities, floor capacity, aisle width and nearby production equipment can all affect how equipment is moved.

Plan your installation

Bring us the equipment details.

Share the manufacturer, equipment size and plant location to discuss your project.

Request a quote832-514-9736