Intek for Automotive OEM Suppliers
Automotive supplier finishing lines often handle brackets, housings, stampings, trim components and assemblies that need consistent cure conditions. Intek infrared oven work should be planned around repeat part orientation, line movement, electrical service, exhaust, make-up air and access around production equipment.
Discuss your installationBrand names identify the equipment discussed. Discuss your equipment model and installation scope with Double D; manufacturer authorization is not implied.
Carrier Spacing And Part Geometry
Infrared cure planning should consider how components face the heat source on racks, hooks or conveyors. Recessed areas, dense loading and part-to-part spacing can influence the final equipment position and line transitions.
Production Flow Constraints
Supplier plants may have fixed conveyor elevations, defined inspection points and limited open aisle space. Oven placement should fit the existing sequence from coating to cure to unload without blocking maintenance or material movement.
Ventilation With Line Equipment
Exhaust, make-up air and nearby booth airflow should be reviewed together. Stable air movement helps protect freshly coated parts and avoids creating unwanted drafts around operators or adjacent stations.
Controls Access During Operation
Electrical panels, controls, disconnects and heater service areas need clear reach. Utility routes should be coordinated with conveyors, safety guarding, plant air, lighting and overhead building services.
Frequently asked questions
What should be measured on automotive supplier parts?
Measure the part envelope on its carrier, the spacing between carriers, loading height, conveyor or cart path and any surfaces that face away from the heat source.
Why is electrical planning important for infrared equipment?
Infrared systems depend on electrical service and controls, so feeder routing, disconnect location and service access need to be addressed early.
How can exhaust affect a coating line?
Exhaust removes air from the area, and without suitable replacement air it can create pressure changes or drafts near application and cure zones.
What should be ready before a relocation review?
Have current equipment photos, utility locations, rigging route limits, new location dimensions, exhaust path options and production sequencing needs ready.