EPTEX Coatings Paint Booth Relocation

Relocating an EPTEX Coatings booth requires careful planning around dismantling, transport within the plant, reassembly and reconnection. The new location should support part flow, booth access, exhaust, make-up air, compressed air, electrical service and maintenance needs.

Discuss your installation

Brand names identify the equipment discussed. Discuss your equipment model and installation scope with Double D; manufacturer authorization is not implied.

Existing Booth Survey Before Dismantling

The current installation should be documented before components are removed. Panel sequence, doors, lights, filters, fan connections, controls, ductwork and utility tie-ins are easier to manage when they are photographed and labeled.

Fit in the New Production Area

The relocated booth should match the actual workpiece route through the facility. Staging, coating, transfer to cure, cooling and inspection areas all affect the final position.

  • Measure parts with racks, carts or hooks included.
  • Check operator aisles and material handling paths.
  • Keep fan, filter and control access open after reassembly.

Exhaust and Utility Reconnection

A new location can change duct length, roof or wall routing, compressed air runs, electrical feeds and control wiring. These connections should be sequenced with plant trades before equipment is anchored.

Restart Checks After Reassembly

After relocation, the booth should be reviewed for panel fit, door operation, filter seating, lighting, fan operation, airflow effects and access to service points before regular production resumes.

Project questions

Frequently asked questions

What should be recorded before moving an EPTEX Coatings booth?

Record panel layout, doors, lights, filters, fan and duct connections, controls, utilities and any access issues in the current location.

How is the new booth location chosen?

The location should support part movement, operator access, exhaust routing, replacement air, utilities, maintenance access and nearby cure or inspection steps.

Will utilities need to be rerouted?

Often they will. Electrical, compressed air, controls and exhaust ductwork may all change when the booth moves.

What should be ready for the relocation walkdown?

Have floor plans, equipment drawings, photos, part dimensions, rack details, utility locations, ceiling height and roof or wall route information.

Plan your installation

Bring us the equipment details.

Share the manufacturer, equipment size and plant location to discuss your project.