EPTEX Coatings for Metal Furniture and Fixtures

Metal furniture and fixture finishing depends on steady part handling, clean transfer between prep and coating, and enough heat and air capacity to keep frames, shelves, cabinets and display components moving without crowding the line.

Discuss your installation

Brand names identify the equipment discussed. Discuss your equipment model and installation scope with Double D; manufacturer authorization is not implied.

Fixture Frames And Hanging Patterns

Furniture frames, cabinet shells and display fixtures often mix long, open parts with flat panels and welded brackets. Installation planning should confirm the largest part envelope, rack spacing, door swing, hook clearance and the path from fabrication through coating to final assembly.

  • Confirm maximum part height, width and diagonal handling length.
  • Leave room for carts, racks and operators around booth openings.
  • Protect finished faces from contact during transfer to the cure area.

Powder Booth And Oven Placement

EPTEX powder booth and cure oven equipment is typically planned around the coating method, part density and available floor space. The booth, reclaim area, oven entrance and cooldown zone need a practical relationship so coated fixtures do not backtrack through grinding, welding or packaging traffic.

Air Balance For Furniture Finishing

Powder collection, booth exhaust and oven heat all affect plant air. Make-up air, duct routing and roof penetrations should be reviewed with the building conditions, nearby doors, seasonal temperature swings and other exhaust sources in mind.

Utility And Access Readiness

Before a site visit, gather equipment drawings, ceiling heights, slab information, fuel or electrical service locations, compressed air details and the intended production flow. Service access should remain open at filters, burners, fans, controls and conveyor or cart paths.

Project questions

Frequently asked questions

What should be measured before installing EPTEX equipment for metal fixtures?

Measure the largest fixture, rack footprint, booth opening, oven opening, ceiling height, column spacing, door clearances and the aisle needed for carts or lifts.

Can a furniture finishing cell use both powder and liquid coating areas?

Yes, but the layout should separate overspray, powder recovery, mixing activity and cure movement so parts stay clean and operators have clear travel paths.

Why is make-up air important for fixture coating?

Booth exhaust and oven operation remove air from the building. Proper make-up air helps stabilize booth performance, comfort and door pressure around the finishing area.

What documents help with a relocation review?

Equipment drawings, photos of the current installation, duct and utility notes, rigging constraints, control panel locations and the desired new production sequence are useful.

Plan your installation

Bring us the equipment details.

Share the manufacturer, equipment size and plant location to discuss your project.