Large oilfield frames, equipment housings and skid assemblies need a paint booth that fits both the workpiece and the way the shop moves it. Double D Mechanical installs, relocates and connects large equipment paint booths with attention to clearances, air movement, exhaust routing, make up air and service access.
Discuss your installationRoom for Frames, Guards and Handling
The booth envelope should be planned around the largest equipment package, not only the finished coating area. Forklifts, carts, cranes, rigging points, removable guards and painter access all affect door openings, booth length and the space needed around the work.
Consistent Air Over Uneven Surfaces
Oilfield equipment can combine flat housings with tubular frames, recessed mounting pads and braced structures. Airflow planning should account for those shapes so overspray is drawn away from the operator and the coating environment stays predictable across the full part.
Ductwork, Heat and Building Openings
Large booths often require substantial exhaust ductwork and may need heated supply air. Roof or wall penetrations, structural framing, weather caps, heater connections and utility runs should be coordinated before equipment is set in place.
Production Sequence Around Finishing
Booth placement affects upstream cleaning, masking, blasting, staging and downstream curing or inspection. A useful layout keeps parts moving forward while preserving space for touch up work, carts, coating materials and maintenance access.
Previsit Information for Layout Work
Bring part drawings or dimensions, weights if they affect handling, photos of the proposed area, ceiling and door measurements, utility locations, fan or booth data if existing equipment is being reused and any known constraints from adjacent operations.
Frequently asked questions
How is a large equipment booth different from a standard booth?
It is planned around oversized workpieces, heavier handling methods, larger exhaust volumes and greater service clearances around doors, fans, filters and controls.
Can an existing booth location be reused?
Sometimes, but the current slab, clearances, duct route, utilities and production flow need to be reviewed against the new booth and the parts being coated.
Why does part handling matter during booth planning?
The booth can fit on paper but still be difficult to use if forklifts, cranes or carts cannot approach safely and repeatably with the workpiece loaded.
What building systems usually affect installation?
Structural steel, roof openings, electrical service, fuel supply, compressed air, fire protection scope, make up air and exhaust discharge locations commonly affect the plan.
What helps reduce downtime during relocation?
Clear equipment dimensions, marked disconnect points, a receiving area plan, utility readiness and coordination with other trades help the relocation sequence stay organized.