Double D Mechanical Services · Preview build
Houston-based · Nationwide installs832-514-9736
Applications · Double D Mechanical

Paint booth heater installation for aircraft and components

Aircraft and component booths can exhaust large volumes of conditioned plant air. Double D Mechanical installs paint booth heaters and air make-up units so replacement air, temperature control, exhaust and utility connections work together in the finishing area.

Discuss your installation

Air replacement for aircraft booths

Aircraft booths and hangar-style finish spaces need replacement air sized and placed to support booth airflow. Discharge points should be reviewed against the workpiece, painter positions, filters, exhaust zones and open doors.

Temperature control near sensitive finishes

Heated make-up air should enter the finish area in a way that avoids drafts and uneven conditions around large surfaces or component racks. The installation should support the process without crowding the booth or service aisles.

Unit location and building openings

Air make-up units may require roof curbs, wall openings, platforms, duct runs and weather protection. Structural conditions, lift access and service clearance should be confirmed before equipment placement.

Connection to controls and exhaust

Heater installation should be coordinated with exhaust fans, booth controls, electrical service, gas piping and safety interlocks. Sequencing these connections reduces rework and helps the booth operate as a coordinated system.

Pre-installation details to gather

Useful details include booth or hangar drawings, exhaust fan data, utility locations, roof access, ceiling height, existing controls, preferred unit location and notes about temperature or airflow complaints.

Project questions

Frequently asked questions

Why does an aircraft booth need coordinated make-up air?

Large exhaust volumes must be replaced in a controlled way so airflow remains stable and the surrounding building is not pulled out of balance.

Can a heater be added to an existing booth?

It may be possible after reviewing the current exhaust, controls, utilities, available space and building routes for ductwork or intake air.

Where can an air make-up unit be installed?

Placement depends on roof or wall access, structural support, intake location, duct routing, utility access and maintenance clearance.

What systems tie into heater installation?

Gas, electrical, controls, exhaust fan operation, dampers, ductwork and booth interlocks may all need coordination.

What should be ready for a site review?

Have equipment drawings, fan data, utility information, photos of the proposed unit area and notes on current booth operating issues.

Plan your installation

Bring us the equipment details.

Share the manufacturer, equipment size and plant location to discuss your project.

Request a quote832-514-9736